Supplying Critical Sample Protection Support During a Facility Upgrade
Azenta Life Sciences was tasked with supplying and maintaining power to more than 280 freezers, refrigerators, and incubators during two planned multi-day shutdowns at a large medical research center at a renowned academic institution. All equipment was carefully monitored every two hours to ensure that the valuable materials contained within were intact at their appropriate temperatures.
Discover how Azenta ensured that all samples remained safe during the shutdown periods!